PURPOSE:
2
SCOPE:
2.1 This procedure is applicable for the
preventive maintenance for Earth pit
3
REFEREN CE:
3.1 maintenance Check list
3.2
IS 3043-1987
4
Other
SOPs having reference to this SOP.
4.1 Nil
4.2 Nil
5
DEFINITION:
5.1 Nil
6 Maintenance Procedure:
·
As
per the Preventive Maintenance schedule,
Engineer informs Powerhouse and
allot Technicians
·
Get
the work permit from Engineer.
·
Necessary
PPE’s to be used for PM activities.
·
Check
the condition of Earth resistance Meter and
it working properly
·
Arrange
the two electrode for Earth pit checking
·
Check
the tightness of Connection and clean the Earth Pit
·
Connect
the equipment as per Fall of Potential
method
·
Taken
Earth resistance value When Grid Connected(below 2 Ohm)
·
Taken
Earth Resistance value when Grid disconnected(below 5 Ohm)
·
If
Earth resistance value is low , adding
water and salt in the Pit
·
After
completion of the PM work, the same should be communicated to respective area Engineer
·
Fill
all data in Check List
·
After
the PM inform to Power House